Rain Director Red spanner light is on – final check robcooper Apr 21, 2020 // Modified 1 year ago Check the system. As a final test please press the “Refresh” button on the control panel. This will empty the header tank and then automatically refill the header tank. Is the red spanner light still off? YesNo